Global Electronics Association Issues PCB Supply Warning: Conventional Material Shortages May Last Through H1 2027
The Global Electronics Association warns that PCB supply chains face shortages from fiberglass cloth and resin to finished boards, with conventional material tightness likely lasting through H1 2027 and no clear relief before mid-2028. PCB orders rose 56.1% year-on-year as of September while shipments grew only 13.3%, pushing high-layer PCB lead times to 16–20 weeks. Four factors—concentrated high
“Printed circuit boards are increasingly in short supply, threatening the next wave of growth in AI and the electronics industry.” The US-headquartered Global Electronics Association recently released a PCB supply warning report, issuing an industry alert over the global printed circuit board (PCB) supply chain.
The report shows that every link in the PCB supply chain—from upstream fiberglass cloth and resin to downstream finished boards—is facing shortages. Although PCB capacity in Asia continues to expand, bottlenecks in fiberglass cloth, resin, copper foil, and production equipment are still constraining finished-board deliveries. The association expects tight supply of conventional materials to last at least through the first half of 2027, with no significant relief before mid-2028. As AI demand absorbs limited capacity, projects in automotive, industrial, and medical sectors face greater supply pressure. At present, whether buyers can secure goods has become the primary production risk—not price.
The severity of the shortage is especially visible in the gap between orders and shipments. Data released by the association on November 19 shows that as of September this year, PCB orders grew 56.1% year-on-year, while shipments rose only 13.3%. Order growth has far outpaced actual delivery capacity, and lead times for high-layer-count PCBs have extended to 16–20 weeks, with some products taking even longer.
The huge gap between orders and shipments means that even with sufficient processors, memory, and other chips, manufacturers cannot complete finished systems without suitable circuit boards.
Four Factors Combine, Making a Quick Relief Unlikely
Why is the PCB shortage difficult to ease quickly? The Global Electronics Association cites four factors: concentrated orders for high-multilayer boards, time needed to expand capacity for scarce product types, existing capacity shifting toward AI materials, and buyers’ advance purchasing amplifying orders.
Specifically, the association believes high-multilayer boards are not new, but purchasing such large volumes in such a short time is new. A typical desktop PC board is about 12 layers; AI server boards are evolving from 20 layers to 40 layers and above, with some high-end boards moving toward 40–60 layers. Each additional layer consumes more fiberglass material, resin, prepreg, copper foil, and copper-clad laminate per board, and also requires more processing time.
AI spending by hyperscale cloud providers is driving orders for specialized circuit boards and materials, with order volumes exceeding the existing supply system’s capacity. Copper foil production lines take time from construction to certification; new copper-clad laminates must pass customer certification; and fiberglass cloth expansion is constrained by loom delivery times. The association cites a technical brief saying that orders at a major Japanese fiberglass loom supplier are fully booked through the end of 2027, constraining fiberglass cloth expansion for PCBs; speeding up existing looms may cause fiber breakage and reduce weaving precision, making short-term output increases difficult.
Capacity reallocation is spreading the shortage. With new supply unable to keep up, suppliers are allocating more existing capacity to higher-margin AI materials, reducing available capacity for traditional materials such as FR-4. Constrained by long certification cycles, fixed-price contracts, and strict procurement rules, customers in industrial, automotive, medical, and defense sectors find it hard to switch materials or suppliers. The harder supply becomes, the more some buyers tend to purchase ahead; buyers expecting only partial deliveries may over-order or place the same demand with multiple suppliers, pushing backlog above actual demand and further lengthening lead times. The association warns that advance purchasing has inflated orders and that orders may correct in 2027.
Market demand divergence is also intensifying. Market research firm Yole forecasts that by 2031, PCBs with 18 layers and above will grow at an annual rate of 15.7%, while 4–6 layer PCBs will grow at about 2.3%; AI-related circuit boards and materials currently account for about 30% of the PCB market and are expected to exceed half by 2031.
Tight Supply Spreads from Substrates to Equipment and Raw Materials
PCB lead times are lengthening, but pressure is unevenly distributed, with materials tighter than boards.
On copper-clad laminates, the Global Electronics Association report cites Electronics Weekly as saying that standard FR-4 CCL lead times have extended from 2–3 weeks a year ago to 6–8 weeks, while high-end low-loss CCL lead times reach 14–18 weeks. On fiberglass cloth, a November research report by Shenwan Hongyuan Securities says that since late last year, electronic yarn projects from Guofu, Jushi, and Kingboard have come online one after another, yet market shortages continue; some companies have announced electronic yarn projects, and based on the fastest one-year construction cycle, new capacity may be released by the end of 2027, with electronic yarn supply likely to remain tight in the future.
Shenwan Hongyuan cites semiconductor industry observers as saying that AI servers and high-speed communications demand are tightening supply and demand for PCBs, substrates, and key materials, with shortages spreading from high-end materials such as Low CTE, Low Dk2, and HVLP4 to high-end CCL, high-end PCB, ABF substrates, process equipment, and consumables. The report cites Unimicron data showing that AI computing power has doubled about every five months since 2024, and AI accelerator (XPU) demand in 2028 is expected to reach six times the 2024 level, while high-end substrate, memory, and advanced packaging capacity will only roughly double over the same period; the PCB substrate material gap is expected to be about 20% in 2027, with lead times for some special equipment exceeding 30 months. On prices, electronic yarn and electronic cloth saw a new round of price increases in October: mainstream G75 electronic yarn quotes rose by RMB 3,000/ton to RMB 25,800–26,000/ton, and 7628 electronic cloth quotes rose by RMB 1.5/meter to RMB 13–13.3/meter.
Risk Comparable to the 2021 Chip Shortage
The Global Electronics Association assesses that the risk from the PCB shortage may be comparable to the 2021 chip shortage. Circuit boards are fundamental components of electronic systems, and upstream PCB materials are more concentrated in supply, making supply problems harder for policymakers to detect in time. Defense, aerospace, and critical infrastructure projects cannot be delivered on schedule without certified circuit boards; constrained upstream material supply will also slow the computing buildout needed for national AI strategies. The association says the impact of the shortage has begun to spread downstream.
The association recommends that governments and industry establish early-warning communication mechanisms, track lead times for PCBs and their materials, extend semiconductor industry incentives (including tax incentives for new equipment investment) to advanced PCB and substrate manufacturing, and accelerate approvals for new capacity projects. It also recommends increasing investment in R&D, testing, and customer certification of alternative materials, and ensuring orders for defense, aerospace, medical, and critical infrastructure through priority allocation mechanisms.
Facing the persistent supply-demand gap, China’s PCB supply chain is also accelerating expansion. The Global Electronics Association report notes that in the first half of 2026 alone, 20 Chinese PCB companies announced combined new capacity investment of more than US$10 billion. According to incomplete statistics from Shanghai Securities News, as of November 19, A-share PCB manufacturers had disclosed more than RMB 100 billion in expansion and fundraising plans during the year, covering AI server boards, high-multilayer boards, high-end HDI, and high-speed/high-frequency boards. Shenghong Technology, Pengding Holdings, Wus Printed Circuit, Shennan Circuits, Shengyi Electronics, and Kinwong Electronic are the main expansion players. Since November, the expansion wave has continued: Kexiang signed a RMB 3 billion Jiujiang AI computing server project, and Shenghong Technology plans to increase capital at its Malaysia base.
Some leading board makers in China’s PCB supply chain have full order books and capacity utilization above 90%, while upstream material supply is diverging. Industry players expect that with new supply released, thick fiberglass cloth supply may improve, while thin fiberglass cloth may remain relatively tight until June 2027. From factory completion to stable supply, board makers still need equipment installation, line debugging, customer certification, and capacity ramp-up. Whether supply and demand ease later will depend on both actual production and delivery progress at board makers and whether new upstream capacity can cover scarce specifications.